Work has been underway over the past few weeks on the renovation of the stairwells and men’s changeroom.
The stairwell to the women’s changeroom is a continuation of the work started back in September to repair a water leakage problem. In September we stopped the leaking and closed in an old window from the outside. We are now repairing the inside wall damage and filling in the closed off basement window.
The plaster from the north wall has been removed. The wall was then insulated and new drywall has been installed.
The drywall has then been finished and painted.
The second part of the project is the paining and repair of the stairwell to the men’s stairwell. This work is still underway.